Craft notes · 7 September 2026 · 4 min read
How to brief a metal fabricator
What to send, what to decide first, and why the structural question comes before the beautiful one.

The best briefs are not the most complete ones. They are the ones that make clear what is fixed and what is open. A fabricator can work from a finished drawing, a sketch on a napkin, a photograph of something seen in a hotel abroad, or a sentence — but each of those needs a different first conversation, and the brief that says which one it is saves a week.
Send what exists
A drawing, if there is one, with the dimensions that matter marked as such. A reference image, with a note on what is liked about it — the proportion, the finish, the way it meets the floor — because a reference carries a dozen decisions and usually only one of them is the point. A photograph of the space as it is, including the bits that are in the way: the column, the duct, the door that has to keep opening.
Say what is decided
Three things shape everything that follows, and it helps to know early which of them is settled. The metal, or at least the family: warm (brass, bronze, copper) or cool (stainless steel, aluminium, zinc). The finish, or at least its character: polished, textured, aged or coated. And the budget range, in the honest sense of what the piece should cost relative to the rest of the room. None of these has to be final. Knowing which are open is what matters.
Structure before surface
The question a workshop asks first is rarely about how a piece will look. It is about what holds it up and what it fixes to. A canopy that appears to float, a screen that stands alone, a counter with no visible legs: each is a piece of engineering wearing a piece of design, and the engineering has to be settled before the surface can be drawn. If the concept has no structure yet, that is the first conversation, not a problem.
What comes back
A good response to a brief is a set of questions and a drawing, not a price. The drawing shows how the piece would be made — sections, joints, fixings, the sequence of installation — and the questions are the decisions the drawing could not make alone. Pricing that arrives before that drawing exists is pricing a guess.
Samples, then commitment
For anything with a finish that matters, the last step before the work starts is a sample in the real metal, at the real finish, looked at in something like the real light. It is the standard the batch is measured against. A sample approved on a screen is a sample approved in the wrong light.


